That’ll do. All done.

ImageImage

The top coat has finally been applied – actually over a week ago but I’ve been too busy to blog it.  I’m quite pleased with the final result.  It’s very, very red.   The surface looks a bit rough in places but that’s just the nature of the beast I guess.  At least there are no runs, especially on the back panel which was quite a challenge to paint.  Many thanks to Tim Warren for helping out once again.   Next step – installation of the glass by Mark Smith Glazing Ltd – once I get him the text for the sign for the door.

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s